Day 2 of our 7 day board building Series. Today Jimmy laminates the bottom of the board and tightens everything up using his "Poor Mans Vacuum" technique. He then sets it on his nose rider rocker jig to make sure the rocker is PERFECT!
enjoyed this--thanks for the post--serial board building!
wish i could binge watch
Mee too. I stopped after the first episode to watch them all in one go at the end :-)